- SUMMARY.md with execution metrics and self-check - STATE.md updated: Phase 7 complete, progress 58% - ROADMAP.md: Phase 7 marked complete (1/1 plans) - REQUIREMENTS.md: FMT-09, FMT-10, FMT-11, FMT-12 marked complete Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
1.9 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-02-25)
Core value: Archive impossible to unpack without knowing the format -- standard tools (7z, tar, unzip, binwalk) cannot recognize or extract contents Current focus: Milestone v1.1 Directory Support -- Phase 7: Format Spec Update
Current Position
Phase: 7 of 11 (Format Spec Update) -- COMPLETE Plan: 1 of 1 -- COMPLETE Status: Phase 7 complete, ready for Phase 8 Last activity: 2026-02-26 -- Phase 7 Plan 01 executed (FORMAT.md v1.1 update)
Progress: [###########.........] 58% (11/~19 plans estimated)
Performance Metrics
Velocity:
- Total plans completed: 11
- Average duration: 3.8 min
- Total execution time: 0.7 hours
| Phase | Plan | Duration | Tasks | Files |
|---|---|---|---|---|
| 07-01 | Format Spec Update | 8 min | 2 | 1 |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- v1.0: IV stored only in TOC, not duplicated in data blocks
- v1.0: Manual binary serialization with to_le_bytes/from_le_bytes (no serde/bincode)
- v1.0: Filename-only entry names -- v1.1 changes this to relative paths with
/separator - v1.0: Always enable all 3 obfuscation features (no flags)
- v1.0: Two-pass TOC serialization for correct data_offsets with encrypted TOC size
- v1.1: No backward compatibility with v1.0 archives (format version bump)
- v1.1: Only mode bits (no uid/gid, no timestamps, no symlinks)
- v1.1: entry_type and permissions fields placed AFTER name, BEFORE original_size in TOC entry
- v1.1: Directory entries use zero-filled crypto fields (uniform entry structure)
- v1.1: Entry size formula: 104 + name_length (was 101)
Pending Todos
None yet.
Blockers/Concerns
None.
Session Continuity
Last session: 2026-02-26 Stopped at: Completed 07-01-PLAN.md -- Phase 7 complete, ready for Phase 8 Resume file: None