- Create 02-01-SUMMARY.md with execution results and deviations - Update STATE.md: Phase 2 in progress, plan 1/2 complete - Update ROADMAP.md: Phase 2 progress 1/2 - Mark 13 requirements complete: FMT-01..04, ENC-01..05, CMP-01..02, INT-01, CLI-01 Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
5.5 KiB
5.5 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 02-core-archiver | 01 | crypto, format, cli |
|
|
|
|
|
|
|
|
|
4min | 2026-02-24 |
Phase 2 Plan 1: Project Foundation Summary
Rust project with AES-256-CBC/HMAC-SHA-256 crypto pipeline, binary format serialization matching FORMAT.md, gzip compression, and clap CLI skeleton
Performance
- Duration: 4 min
- Started: 2026-02-24T20:54:36Z
- Completed: 2026-02-24T20:58:28Z
- Tasks: 2
- Files modified: 8
Accomplishments
- Complete Rust project structure with 7 source modules and all dependencies
- Binary format types (Header: 40 bytes, TocEntry: 101+N bytes) with byte-accurate serialization matching FORMAT.md Sections 4 and 5
- Full crypto pipeline: AES-256-CBC encrypt/decrypt, HMAC-SHA-256 compute/verify, SHA-256 hash, random IV generation
- Gzip compression/decompression with reproducible output and smart compression heuristic
Task Commits
Each task was committed atomically:
- Task 1: Project scaffolding with Cargo, CLI skeleton, and key module -
c647f3a(feat) - Task 2: Format types, crypto pipeline, and compression module -
6292b41(feat)
Files Created/Modified
Cargo.toml- Project manifest with aes, cbc, hmac, sha2, flate2, clap, rand, anyhowsrc/main.rs- CLI entry point with clap parse and dispatch to pack/unpack/inspectsrc/cli.rs- Clap derive structs: Cli, Commands enum (Pack/Unpack/Inspect)src/key.rs- Hardcoded 32-byte AES-256 key constantsrc/format.rs- Header and TocEntry structs with write/read serialization, entry_size, compute_toc_sizesrc/crypto.rs- encrypt_data, decrypt_data, compute_hmac, verify_hmac, sha256_hash, generate_ivsrc/compression.rs- compress, decompress, should_compresssrc/archive.rs- Stub module for pack/unpack/inspect orchestration (Plan 02-02)
Decisions Made
- Used
rand::Fill::fill()instead oftry_fill()for IV generation (correct rand 0.9 API for array fill) - Kept edition 2021 as specified in the plan for broad compatibility
- Dead-code warnings are expected and acceptable -- modules are not yet called from main; they will be wired in Plan 02-02
Deviations from Plan
Auto-fixed Issues
1. [Rule 3 - Blocking] Fixed rand 0.9 API for IV generation
- Found during: Task 2 (crypto.rs implementation)
- Issue:
try_fill()method does not exist on[u8; 16]in rand 0.9. TheFilltrait providesfill(), nottry_fill(). - Fix: Changed from
iv.try_fill(&mut rand::rng())torand::Fill::fill(&mut iv, &mut rand::rng()) - Files modified: src/crypto.rs
- Verification: cargo build succeeds
- Committed in:
6292b41(Task 2 commit)
Total deviations: 1 auto-fixed (1 blocking) Impact on plan: Minor API correction for rand 0.9. No scope creep.
Issues Encountered
None beyond the rand API correction noted above.
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- All building-block modules are implemented and compile successfully
- Ready for Plan 02-02: Pack, inspect, and unpack commands with full archive orchestration
- The archive.rs module is a stub awaiting the orchestration logic
- 25 dead-code warnings will be resolved when modules are wired into commands
Self-Check: PASSED
All 8 created files verified present. Both task commits (c647f3a, 6292b41) verified in git log.
Phase: 02-core-archiver Completed: 2026-02-24