## Current Position
|
||||
|
||||
Phase: 7 of 11 (Format Spec Update) -- first phase of v1.1
|
||||
Plan: Not yet planned
|
||||
Status: Ready to plan
|
||||
Last activity: 2026-02-25 -- v1.1 roadmap created (phases 7-11)
|
||||
Phase: 7 of 11 (Format Spec Update) -- COMPLETE
|
||||
Plan: 1 of 1 -- COMPLETE
|
||||
Status: Phase 7 complete, ready for Phase 8
|
||||
Last activity: 2026-02-26 -- Phase 7 Plan 01 executed (FORMAT.md v1.1 update)
|
||||
|
||||
Progress: [##########..........] 55% (10/~18 plans estimated)
|
||||
Progress: [###########.........] 58% (11/~19 plans estimated)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity (from v1.0):**
|
||||
- Total plans completed: 10
|
||||
- Average duration: 3.6 min
|
||||
- Total execution time: 0.6 hours
|
||||
**Velocity:**
|
||||
- Total plans completed: 11
|
||||
- Average duration: 3.8 min
|
||||
- Total execution time: 0.7 hours
|
||||
|
||||
| Phase | Plan | Duration | Tasks | Files |
|
||||
|-------|------|----------|-------|-------|
|
||||
| 07-01 | Format Spec Update | 8 min | 2 | 1 |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -37,6 +41,9 @@ Recent decisions affecting current work:
|
||||
- v1.0: Two-pass TOC serialization for correct data_offsets with encrypted TOC size
|
||||
- v1.1: No backward compatibility with v1.0 archives (format version bump)
|
||||
- v1.1: Only mode bits (no uid/gid, no timestamps, no symlinks)
|
||||
- v1.1: entry_type and permissions fields placed AFTER name, BEFORE original_size in TOC entry
|
||||
- v1.1: Directory entries use zero-filled crypto fields (uniform entry structure)
|
||||
- v1.1: Entry size formula: 104 + name_length (was 101)
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -48,6 +55,6 @@ None.
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-25
|
||||
Stopped at: v1.1 roadmap created -- ready to plan Phase 7
|
||||
Last session: 2026-02-26
|
||||
Stopped at: Completed 07-01-PLAN.md -- Phase 7 complete, ready for Phase 8
|
||||