# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-02-25)
|
|
|
|
**Core value:** Archive impossible to unpack without knowing the format -- standard tools (7z, tar, unzip, binwalk) cannot recognize or extract contents
|
|
**Current focus:** Milestone v1.1 Directory Support -- Phase 7: Format Spec Update
|
|
|
|
## Current Position
|
|
|
|
Phase: 7 of 11 (Format Spec Update) -- first phase of v1.1
|
|
Plan: Not yet planned
|
|
Status: Ready to plan
|
|
Last activity: 2026-02-25 -- v1.1 roadmap created (phases 7-11)
|
|
|
|
Progress: [##########..........] 55% (10/~18 plans estimated)
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity (from v1.0):**
|
|
- Total plans completed: 10
|
|
- Average duration: 3.6 min
|
|
- Total execution time: 0.6 hours
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- v1.0: IV stored only in TOC, not duplicated in data blocks
|
|
- v1.0: Manual binary serialization with to_le_bytes/from_le_bytes (no serde/bincode)
|
|
- v1.0: Filename-only entry names -- v1.1 changes this to relative paths with `/` separator
|
|
- v1.0: Always enable all 3 obfuscation features (no flags)
|
|
- v1.0: Two-pass TOC serialization for correct data_offsets with encrypted TOC size
|
|
- v1.1: No backward compatibility with v1.0 archives (format version bump)
|
|
- v1.1: Only mode bits (no uid/gid, no timestamps, no symlinks)
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
None.
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-02-25
|
|
Stopped at: v1.1 roadmap created -- ready to plan Phase 7
|
|
Resume file: None
|